| Studio 1 Area Before The Main Studio Building Star |
 |
| Posted by: NickJames |
Date Posted: Jan 22, 2009 |
| Description: | 4th January 2008, we cleared the room and have taken down the false ceiling. The building should start tomorrow. You can still see the network and audio cables we have run in from the CTA Engineering Area. |
| Post a Comment about this Image |
<< Back
| |
| |