| Starting To Run Cables From CTA To Studio 1 & 2 |
 |
| Posted by: NickJames |
Date Posted: Dec 28, 2008 |
| Description: | One of the first jobs we had to do was decide where the studios and the engineering areas were going to be. Then we had to run cables between them. |
| Post a Comment about this Image |